by Alejandro | Oct 11, 2024
Case Study Overview LIRR needed a safe and efficient solution for rerailing derailed trains due to frequent derailments that required costly external contractors. Railquip provided a standard portable hydraulic rerailing system that allowed LIRR to handle these...
by Wender Oropeza | Sep 10, 2024
Case Study Overview In pursuit of operational excellence, our client sought to standardize maintenance practices across all locations with an established maintenance system featuring multiple turntables. The challenge: A gap existed in an existing railyard where the...
by Wender Oropeza | Nov 20, 2023
BART – BAY AREA RAPID TRANSIT AUTHORITY Overview In pursuit of operational excellence, our client sought to standardize maintenance practices across all locations. With an established maintenance system featuring multiple turntables. The challenge: A gap existed...
by Wender Oropeza | Nov 9, 2023
TLC CASINO ENTERPRISES, INC. Overview Our task was to design, manufacture, and install a rotating bar floor in an existing 2nd-floor restaurant, taking into consideration the limitations imposed by the existing building structure, which imposed restrictions on weight...
by Wender Oropeza | Nov 28, 2022
O TRAIN MAINTENANCE FACILITY Overview O Train was a brand new line that was developed in Ottawa Canada 2015 and opened up a tender process to build their train maintenance facility. As a supplier of all lifting equipment for trains we were able to offer them a...