Long Island Railroad Case Study

Case Study Overview LIRR needed a safe and efficient solution for rerailing derailed trains due to frequent derailments that required costly external contractors. Railquip provided a standard portable hydraulic rerailing system that allowed LIRR to handle these...

Clark Construction – Case study

Case Study Overview In pursuit of operational excellence, our client sought to standardize maintenance practices across all locations with an established maintenance system featuring multiple turntables. The challenge: A gap existed in an existing railyard where the...

BART – BAY AREA RAPID TRANSIT AUTHORITY

BART – BAY AREA RAPID TRANSIT AUTHORITY Overview In pursuit of operational excellence, our client sought to standardize maintenance practices across all locations. With an established maintenance system featuring multiple turntables. The challenge: A gap existed...

TLC CASINO ENTERPRISES, INC.

TLC CASINO ENTERPRISES, INC. Overview Our task was to design, manufacture, and install a rotating bar floor in an existing 2nd-floor restaurant, taking into consideration the limitations imposed by the existing building structure, which imposed restrictions on weight...

O TRAIN MAINTENANCE FACILITY

O TRAIN MAINTENANCE FACILITY Overview O Train was a brand new line that was developed in Ottawa Canada 2015 and opened up a tender process to build their  train maintenance facility. As a supplier of all lifting equipment for trains we were able to offer them a...