by Alejandro | Feb 25, 2025
Case Study: 60-Ton Lifting Jacks for Cerrejon Mine Overview Year: 2021 Partner: Eymaq Location: La Guajira, Colombia Product: 3 sets of four 60-ton lifting jacks – Key Challenges Delivering and installing heavy-duty lifting equipment at Cerrejón posed several...
by Alejandro | Oct 30, 2024
Case Study Overview WMATA needed to replace its stationary drop table at the Shady Grove S&I shop due to excessive maintenance costs and aging parts. Railquip provided a custom-designed solution that was more cost-effective than a rebuild and was installed in a...
by Alejandro | Oct 30, 2024
Case Study Overview BART required a solution to efficiently change the direction of railcars in their existing railyard. Railquip’s Automated Railcar Turntable provided a seamless, automated system to address this gap. – Our Process 1. Identification of the Challenge...
by Alejandro | Oct 12, 2024
Case Study Overview AMTRAK needed a custom-built Railbound Tunnel Crane for the New York Penn Station Rehabilitation Project. The crane had to operate within strict clearance limits and manage precise placement of track and switch panels at speeds up to 60 mph – Our...
by Alejandro | Oct 12, 2024
Case Study Overview In 2015, the O-Train in Ottawa, Canada, sought a complete train maintenance facility for their new fleet. Railquip provided a fully customized underground lifting system to safely and efficiently perform regular train maintenance. – Our Process 1....