CERREJÓN COAL MINE IN COLOMBIA Case Study

CERREJÓN COAL MINE IN COLOMBIA Case Study

Case Study: 60-Ton Lifting Jacks for Cerrejon Mine Overview Year: 2021 Partner: Eymaq  Location: La Guajira, Colombia Product: 3 sets of four 60-ton lifting jacks – Key Challenges Delivering and installing heavy-duty lifting equipment at Cerrejón posed several...
Bay Area Rapid Transit Authority (BART) Case Study

Bay Area Rapid Transit Authority (BART) Case Study

Case Study Overview BART required a solution to efficiently change the direction of railcars in their existing railyard. Railquip’s Automated Railcar Turntable provided a seamless, automated system to address this gap. – Our Process 1. Identification of the Challenge...
AMTRAK: Penn Station Rehabilitation Project Case Study

AMTRAK: Penn Station Rehabilitation Project Case Study

Case Study Overview AMTRAK needed a custom-built Railbound Tunnel Crane for the New York Penn Station Rehabilitation Project. The crane had to operate within strict clearance limits and manage precise placement of track and switch panels at speeds up to 60 mph – Our...
O-Train Case Study

O-Train Case Study

Case Study Overview In 2015, the O-Train in Ottawa, Canada, sought a complete train maintenance facility for their new fleet. Railquip provided a fully customized underground lifting system to safely and efficiently perform regular train maintenance. – Our Process 1....