Our projects
Railquip specializes in turnkey maintenance facilities for light, medium, and heavy rail transit, streetcar and metro agencies, commuter and passenger railroads, and Class I heavy-haul and shortline railroad companies on a global basis.
To the general contractor, we offer functional designs for these maintenance facilities.
Our scope of supply includes equipment maintenance, installation, commissioning, testing, operator training, and full after-sales service support.
Current & Past Projects
OCTA project site in Santa Ana, CA, Case Study
With deliveries underway, most equipment is expected on-site between February and March. Our team is aiming to have the majority of components fully set
CERREJÓN COAL MINE IN COLOMBIA Case Study
To modernize Cerrejón’s lifting capabilities, Railquip and Eymaq provided a tailored solution: three sets of four 60-ton lifting jacks designed to replace outdated equipment
Washington Metropolitan Area Transit Authority – Case study
WMATA needed to replace its stationary drop table at the Shady Grove S&I shop due to excessive maintenance costs and aging parts. Railquip provided
Bay Area Rapid Transit Authority (BART) Case Study
BART required a solution to efficiently change the direction of railcars in their existing railyard. Railquip’s Automated Railcar Turntable provided a seamless, automated system
AMTRAK: Penn Station Rehabilitation Project Case Study
AMTRAK needed a custom-built Railbound Tunnel Crane for the New York Penn Station Rehabilitation Project. The crane had to operate within strict clearance limits
O-Train Case Study
In 2015, the O-Train in Ottawa, Canada, sought a complete train maintenance facility for their new fleet. Railquip provided a fully customized underground lifting
BNSF Burlington Northern Santa Fe Case Study
BNSF required a safer, more efficient way to pull locomotives over their wheel truing machine, addressing safety concerns and reducing pollution in the workshop.
Long Island Railroad Case Study
LIRR needed a safe and efficient solution for rerailing derailed trains due to frequent derailments that required costly external contractors. Railquip provided a standard
Clark Construction – Case study
In pursuit of operational excellence, our client sought to standardize maintenance practices across all locations with an established maintenance system featuring multiple turntables. The
TLC CASINO ENTERPRISES, INC.
Our task was to design, manufacture, and install a rotating bar floor in an existing 2nd-floor restaurant, taking into consideration the limitations imposed by