AMTRAK needed a custom-built Railbound Tunnel Crane for the New York Penn Station Rehabilitation Project. The crane had to operate within strict clearance limits and manage precise placement of track and switch panels at speeds up to 60 mph

Our Process

The Results

The 110-ton Railbound Railway Crane and supporting equipment were successfully designed, built, and delivered, enhancing AMTRAK’s efficiency in the NY Penn Station Rehabilitation Project.

Key Specifications:

System: 110-Ton Railbound Tunnel Crane

Speed: Operation at speeds up to 60 mph (100 km/h)

Purpose: Loading, unloading, and placing track and switch panels in confined spaces

LocationNY Penn Station and Wilmington Yard, USA

Portable Hydraulic Rerailing Equipment

ABOUT THE PRODUCT

The 110-Ton Railbound Tunnel Crane is designed to safely and efficiently load and position track and switch panels at high speeds, while maintaining precise load orientation in narrow spaces like tunnels.

The Benefits of Railway Cranes

  • Precision Operation: Designed to work under tight clearance envelopes and catenary wires.
  • High-Speed Efficiency: Operates at up to 60 mph for fast transport and installation of materials.
  • Custom-Built: Tailored to meet AMTRAK’s specific project needs.
  • Resilience: Delivered despite global supply chain disruptions, ensuring project continuity.